7:29 pm

March 31, 2012
7:36 pm
March 20, 2013
A new lotus album that doesnt blow, oh wait… never gunna happen now that twiztid are gone. (reference to opaque brotherhood btw)
new blaze album
vanilla ice album (just to see if it will actually happen)
Shapeshifter – only because i totally dug the dj clay track, and hey girl video was not too bad.
cold 187um fired from the label because he wont paint his face.
drive by lp would be dope too
7:41 pm
Moderators
August 12, 2012
7:43 pm

March 31, 2012
7:45 pm

March 31, 2012
7:47 pm
July 11, 2012
The Warlock said
novocaine said
A new lotus album that doesnt blow, oh wait… never gunna happen now that twiztid are gone. (reference to opaque brotherhood btw)i strongly disagree with opaque being a bad album.. thats prob in my top 10 psy albums of all time..
yep opaque is dope…some tracks i skip but overall dope shit…love the masks for this one too…
7:51 pm
May 29, 2013
7:57 pm

March 31, 2012
Violentdope said
The Warlock said
novocaine said
A new lotus album that doesnt blow, oh wait… never gunna happen now that twiztid are gone. (reference to opaque brotherhood btw)i strongly disagree with opaque being a bad album.. thats prob in my top 10 psy albums of all time..
yep opaque is dope…some tracks i skip but overall dope shit…love the masks for this one too…
honestly the only tracks i dislike are the bonus ones.. “Rejected” is the only one i dig.. & yeah the masks were fresh.. when i 1st saw ’em i thought they were on some MK reptile shit haha
8:03 pm
March 20, 2013
PunkRockJuggalo said
Soopa Villainz reunion albumForgotten Freshness 5
DJ Clay LP
Shaggy Solo Album
Violent J Solo Album
Bloody Brothers Album with ICP and Boondox
Psychopathics From Outer Space 4
to be continued…..
i cosign all of these cept ff5/clay lp/ stupid villanz
an icp/boondox project would be absolute fire too.
As for opaque brotehrhood i just didnt dig it nearly as much as i liked black rain/tftlp (marz edition, abk edition was a complete joke.) i would love to see J do another ‘wizard of the hood’ style album, like th whole story aspect rather then something like the shining.
Another shaggz album would be killer and call it fuck the fucking fuck off motherfacko!
Did anyone else dislike pfos 3? imo it wasnt nearly as good 1/2
8:24 pm
April 4, 2012
8:54 pm

March 31, 2012
9:16 pm
March 20, 2013
i think for me i stopped paying attention to most underground hiphop from like 2006ish till 2009, so i never really got into it, i came around on the twiztid releases and a KOD track played on the radio station i was listening too at the time pulled me back to hip hop.
so for me the first 2 pfos are classics and i can lsten to them constantly but just didnt dig the third because it isnt representative of what i was enjoying at the time.
9:50 pm
March 30, 2013
novocaine said
i think for me i stopped paying attention to most underground hiphop from like 2006ish till 2009, so i never really got into it, i came around on the twiztid releases and a KOD track played on the radio station i was listening too at the time pulled me back to hip hop.
so for me the first 2 pfos are classics and i can lsten to them constantly but just didnt dig the third because it isnt representative of what i was enjoying at the time.
I agree about PFOS3. not the most memorable album. “My Van” is one of the best, complete batshit insane lol… but yeah PFOS2 my brother n I copped that after exiting the theatre tripping balls at the third Matrix movie. We went in my car n started bumping it… “Conquer” sounded so damn weird n cool lol…
Give “Opaque” another chance. In ways it is a perfect Dark Lotus album. Overall better than the whole of “Black Rain” which had a couple shitty tracks and (this is my first time admitting this outside of my own brain, so bear with me): shitty verses by my homie Joey Utsler. I know he was drinking heavily then but what the fuck! His lyrics are so bad they’re almost tragic. There I admitted it. But 2 Dopes solos are some of the best in all of PSY.
10:13 pm
March 20, 2013
10:15 pm
August 27, 2012
A new gimmick with two rapping migits…one being a Leprechaun and one being a garden gnome…
Or a Sasquatch or creature from “Marsh Lagoon”.
Man i should be in creative control over at PSY…Id be clockin dollas son
"Somewhere theres a Waffle House thats severely understaffed right now" -OCJ to Scruffy watching a second stage act at the Gathering.
10:21 pm
March 30, 2013
Get some adderall munching coose to don paint and just scream and bang her head on the microphone like Rosie the Pinhead in “Freaked” but since PSY is all about the name changing, shell be called Baby Banshee Bitch. She’ll fake an Irish lilt and shoot four leaf clovers out of her ass at shows end. That leprechaun you mentioned OCJ, he’ll start put as Baby Banshee Bitchs hype man and roadie for Psychopathic until he gets his gimmick right.
“A friend with weed is a friend indeed.
But a friend with gold is better I’m told.” – Leprechaun in the Hood.
10:39 pm
August 27, 2012
10:41 pm
December 3, 2012
How bout an alcoholic wizard who can only do magic when he is drunk, has an affinity for those troll dolls, and moonlights as a jizz mopper for one of those xxx theaters? I can see a concept album out of that premise
There's a gateway in our minds
That leads somewhere out there, far beyond this plane
Where reptile aliens made of light
Cut you open and pull out all your pain
Sturgill Simpson- Turtles All The Way Down
Most Users Ever Online: 1174
Currently Online:
26 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Top Posters:
The Warlock: 11727
King Lucem Ferre: 9104
Old Mr Dangerous: 9080
krunk: 8380
OCJ_Brendan: 6148
Member Stats:
Guest Posters: 755
Members: 6280
Moderators: 6
Admins: 2
Forum Stats:
Groups: 5
Forums: 28
Topics: 12376
Posts: 246709
Newest Members:
CarbixTools, charliecl, parchedgam, creatorpixelModerators: GanjaGoblin: 2893, Psyral: 4297, bozodklown: 394, scruffy: 11447, PunkRockJuggalo: 6559, Pigg: 6492
Administrators: admin: 1, ScottieD: 845




